Flossmoor Road
| Photo Gallery |
| Project Title: | Flossmoor Road | |
| Location: | Cicero to Kedzie Avenue | |
| Client: | Cook County Highway Department | |
| Budget: | $1,311,304 | |
| Project Specs/Tonnages: | 1.5" Surface Removal | 37,300 Sq. Yds. |
| Hot In Place Recycling | 37,300 Sq. Yds. | |
| Pavement Patching | 1,290 T. | |
| Poly Level Binder | 1,570 T. | |
| 1.5" Asphalt Surface Course | 3,200 T. | |
Improvement of Flossmoor Road consisted of milling the surface to a depth of 1.5", repairing the existing surface with pavement patching and Hot In Place pavement recycling, poly level binder, 1.5" asphalt surface course as well as guardrail removal, sidewalk reloaction, storm drain and culvert installation, restoration of the parkway with topsoil, striping signage protection.
