Projects > 2008

Flossmoor Road

Photo Gallery
Project Title: Flossmoor Road
Location: Cicero to Kedzie Avenue
Client: Cook County Highway Department
Budget: $1,311,304
Project Specs/Tonnages: 1.5" Surface Removal 37,300 Sq. Yds.
Hot In Place Recycling 37,300 Sq. Yds.
Pavement Patching 1,290 T.
Poly Level Binder 1,570 T.
1.5" Asphalt Surface Course 3,200 T.

Improvement of Flossmoor Road consisted of milling the surface to a depth of 1.5", repairing the existing surface with pavement patching and Hot In Place pavement recycling, poly level binder, 1.5" asphalt surface course as well as guardrail removal, sidewalk reloaction, storm drain and culvert installation, restoration of the parkway with topsoil, striping signage protection.