Far South Arterial Street Resurfacing

12 Locations Throughout the Far South Side of Chicago

This Chicago Department of Transportation Project consisted of 10.2 Miles of resurfacing at 12 locations on the far south side of Chicago. Work consisted of curb & gutter and ADA ramp repair, pavement patching, milling, HMA resurfacing, and new pavement marking. The project had tough time constraints, but with a great team effort, Gallagher completed the project on time.

Client: CDOT
Milling: 236,200 SYs
Aggregate Shoulder: 3,000 Tons
Asphalt: 39,100 Tons